Previous |  Up |  Next

Article

References:
[1] Task Force on Common Mode Outages of Bulk Power Supply Facilities of the Application of Reliability Methods Subcommittee of Power System Engineering Committee, IEEE Power Engineering Society: Common Forced Outage of Overhead Transmission Lines. IEEE Trans. Power Apparatus and Systems PAS - 95 (1976), 3, 859-863.
[2] R. Billinton T. K. P. Medicherla M. S. Sachdev: Common cause outages in multiple circuit transmission lines. IEEE Trans. Reliability R-27 (1978), 1, 128-131.
[3] M. Avriel A. C. Williams: Complementary geometric programming. SIAM J. Applied Math. 79 (1970), 1, 125-141. MR 0267901
[4] K. Swarup R. K. Verma: A method to solve complementary geometric program. J. Eng. Production 3 (1979), 3-4, 185-197.
[5] C. S. Beightler D. T. Phillips: Applied Geometric Programming. Wiley, New York 1976. MR 0680967
[6] Ron. S. Dembo: The Solution of Complementary Geometric Programming Problems. M. Sc. Thesis, Technion, Israel Institute of Technology, Haifa 1970.
[7] R. J. Duffin E. L. Peterson C. Zener: Geometric Programming-Theory and Applications. John Wiley and Sons, New York 1967. MR 0214374
[8] M. J. Rijckaert X. M. Martenes: Bibliographical note on geometric programming. J. Optimization Theory and Appl. 26 (1978), 325-333. MR 0523804
[9] R. J. Duffin E. L. Peterson: Geometric programs treated with slack variables. Applied Analysis 2 (1972), 255-267. MR 0395843
Partner of
EuDML logo