Previous |  Up |  Next

Article

References:
[1] K. R. Baker, G. D. Scudder: Sequencing with earliness and tardiness penalties. A review. Oper. Res. 38 (1990), 22-36. MR 1041230 | Zbl 0699.90052
[2] M. C. Ferris, M. Vlach: Scheduling with earliness and tardiness penalties. Naval Res. Logist. 39 (1992), 229-245. Zbl 0780.90060
[3] A. H. G. Rinnooy Kan: Machine Scheduling Problems. H. E. Steufert Kroese B. V., Leiden 1976.
[4] M. Vlach: On scheduling with earliness and tardiness penalties. Methods Oper. Res. 45 (1983), 367-375. Zbl 0517.90037
[5] K. Zimmermann: Some optimization problems with extremal operations. Math. Programming Study 22 (1984), 237-251. MR 0774246 | Zbl 0558.90102
Partner of
EuDML logo