[1] Collan, M.:
Thoughts about selected models for real option valuation. Acta Univ. Palacki. Olomuc., Math. 50, 2 (2011), 5–12.
MR 2920703
[2] Collan, M.: The Pay-Off Method: Re-Inventing Investment Analysis. CreateSpace Inc., Charleston, NC, 2012.
[4] Datar, V., Mathews, S.: European real options: an intuitive algorithm for the Black Scholes formula. Journal of Applied Finance 14 (2004), 7–13.
[5] Mathews, S., Datar, V., Johnson, B.:
A practical method for valuing real options: The Boeing approach. Journal of Applied Corporate Finance 19, 2 (2007), 95–104.
DOI 10.1111/j.1745-6622.2007.00140.x
[6] Mathews, S., Salmon, J.: Business Engineering: A Practical Approach to Valuing High-Risk, High-Return Projects Using Real Options. In: Tutorials in Operations Research (2007), 157–175.
[7] Brealey, R. A., Myers, S. C.: Principles of Corporate Finance. Mcgraw Hill Series in Finance, Mcgraw-Hill, 1996.
[8] Esty, B. C.: Improved techniques for valuating large scale projects. J. Proj. Financ. (1999), 9–25.
[9] Ashby, W. R.:
Requisite variety and its implications for the control of complex systems. Cybernetica 1, 2 (1958), 83–99.
Zbl 0093.09803
[10] O’Regan, B., Moles, R.:
A system dynamics model of mining industry investment decisions within the context of environmental policy. Journal of Environmental Planning and Management 44, 2 (2001), 245–262.
DOI 10.1080/09640560120033731
[11] O’Regan, B., Moles, R.:
Using system dynamics to model the interaction between environmental and economic factors in the mining industry. Journal of Cleaner Production 14, 8 (2006), 689–707.
DOI 10.1016/j.jclepro.2004.05.006
[12] Savolainen, J., Collan, M., Luukka, P.: Modeling Profitability of Metal Mining Investments as Dynamic Techno-Economic Systems. In: Workshop on Sustainability and Decision Making, 25.–26. 2. 2015 RWTH, Aachen, Germany, 2015, p. 15.
[13] Sontamino, P., Drebenstedt, C.: Decision Support System of Coal Mine Planning Using System Dynamics Model: Introduction and Reviews. 6th Freiberg–St. Petersburg Kolloquium junger Wisseshaftler 15–17 Juni, 2011, Freiberg, Germany (2011), 1–6.
[14] Tsekrekos, A. E., Shackleton, M. B., Wojakowski, R.:
Evaluating natural resource investments under different model dynamics: managerial insights. European Financial Management 18, 4 (2012), 453–575.
DOI 10.1111/j.1468-036X.2010.00544.x
[15] Triantis, A.:
Realizing the Potential of Real Options: Does Theory Meet Practice?. Journal of Applied Corporate Finance 17, 2 (2005), 8–16.
DOI 10.1111/j.1745-6622.2005.00028.x
[16] Lander, D. M., Pinches, G. E.:
Challenges to the practical implementation of modeling and valuing real options. Q. Rev. Econ. Financ. 38, 3 (1998), 537–567.
DOI 10.1016/S1062-9769(99)80089-1
[17] Smith, J. E., McCardle, K. F.:
Options in the real world: Lessons learned in evaluating oil and gas investments. Oper. Res. 47, 1 (1999), 1–15.
DOI 10.1287/opre.47.1.1 |
Zbl 1035.91503
[19] Jaimungal, S., Lawryshyn, Y.:
Incorporating Managerial Information into Real Option Valuation. In: R., Aïd, M., Ludkovski, R, Sircar, Eds.: Fields Institute Communications 74, Commodities, Energy and Environmental Finance, Springer, New York, 2015, 213–238.
MR 3380396
[20] Abdel Sabour, S., Poulin, R.:
Valuing real capital investments using the least-squares Monte Carlo method. Eng. Econ. 51, 2 (2006), 141–160.
DOI 10.1080/00137910600705210
[21] Cardin, M., De Neufville, R., Kazakidis, V.:
A process to improve expected value of mining operations. Min. Technol. 117, 2 (2008), 65–70.
DOI 10.1179/174328608X362631
[22] Haque, M. A., Topal, E., Lilford, E.:
A numerical study for a mining project using real options valuation under commodity price uncertainty. Resour. Policy 39 (2014), 115–123.
DOI 10.1016/j.resourpol.2013.12.004
[23] Samis, M., Davis, G. A., Laughton, D., Poulin, R.:
Valuing uncertain asset cash flows when there are no options: A real options approach. Resour. Policy 30, 4 (2006), 285–298.
DOI 10.1016/j.resourpol.2006.03.003
[24] Savolainen, J., Collan, M., Luukka, P.: Using a dynamic system model in ex-ante operational and profitability analysis of a metal mine through simulation. In: Book of abstracts of the ECCOMAS CM3 Thematic Conference – New Challenges for the Greening of Transport, 25.–27.5.2015, Jyväskylä, Finland, 2015, 97–100.
[25] Dias, M. A. G., Rocha, K. M. C.: Petroleum concessions with extensible options using mean reversion with jumps to model oil prices. In: 3rd International Conference on Real Options, Wassenaar/Leiden, June 6–8, 1999, L., Trigeorgis, Eds., Oxford University Press, 1999.
[26] de Magalhaes Ozorio, L., Shevchenko, P. V., De Lamare Bastian-Pinto, C.: The Choice of Stochastic Process in Real Option Valuation II: Selecting Multiple Factor Models. In: 7th International Conference on Real Options, Tokyo, 2013.
[28] Lemelin, B., Abdel Sabour, S. A., Poulin, R.:
Valuing mine 2 at raglan using real options. Int. J. Mining, Reclam. Environ. 20, 1 (2006), 46–56.
DOI 10.1080/13895260500430294
[29] Abdel Sabour, S. A., Dimitrakopoulos, R. G., Kumral, M.: Mine design selection under uncertainty. Min. Technol. IMM Trans. Sect. A, 117, 2 (2008), 53–64.